Chelveston Renewable Energy & Innovation Park, Chelveston Airfield, Caldecott, Chelveston, Northamptonshire, NN9

An exciting new development in Northamptonshire, providing for bespoke buildings to occupier requirements, integrating cutting edge on-site sustainable energy generation from dedicated solar and wind sources (up to 200GWh pa) & redundancy with 2 Grid Connections (including a 26MW import licence, 80MW export & 20MW battery storage). Providing up to 32,900 m2 bespoke buildings for occupiers with large energy requirements, in a secure, self-contained environment.

RENEWABLE ENERGY SUPPLY
WIND – SOLAR – HYDROGEN – PEAK LOPPING PLANT – POWER STORAGE

9 x125m wind turbines with 25.65MW installed capacity.
250,000 solar panels on site with 60 MW installed capacity.
Further 250,000 solar panels with 60MW installed capacity serving hydrogen generation plant.
80MWh export grid connection.
26MWh import grid connection for back up and reinforcement.
10MW On-Site hydrogen production plant (3,000kg per day) Under Construction.
47 MW Peak Lopping Plant (consented and to be constructed).
20MW Battery Store – back-up / reinforcement